Difference between revisions of "2008 IGT Project Week Prostate Breakout Session"
From NAMIC Wiki
(→Setup) |
|||
Line 24: | Line 24: | ||
==Localiser== | ==Localiser== | ||
− | *Z-frame and calibration | + | *Image transfer (DICOM OK) |
− | * | + | *Z-frame and calibration (Jack was able to get good registration. |
+ | |||
+ | *Open IGT Link image transfer (Tonight, may continue to tomorrow) | ||
+ | *transferring calibration result (open igt link CLEAR) | ||
==Planning== | ==Planning== |
Revision as of 20:58, 8 December 2008
Home < 2008 IGT Project Week Prostate Breakout SessionBack to 2008 IGT Project Week
Moderator:
- Noby Hata
Attendees:
Agenda:
- Final walk through of the steps
Setup
- Power supply
- Cable (Eithernet, power)
- Robot and the associated computers
- MRI
- Slicer and associated computers
- Radvision
- network (IP address?)
- compresso (connector needs to be checked ?)
- monitor (how many, where?) (needs one from Monitor)
- phantom
- Coil
Localiser
- Image transfer (DICOM OK)
- Z-frame and calibration (Jack was able to get good registration.
- Open IGT Link image transfer (Tonight, may continue to tomorrow)
- transferring calibration result (open igt link CLEAR)
Planning
- Planning in Slicer
- Planning in RadVision
Scan Control
- Scan control from Slicer
- Scan control from Radvision
Robot Control
- robot control from Slicer
- robot control from RadVision
Device placement
- Needle
- Seeds