Difference between revisions of "2008 IGT Project Week Prostate Breakout Session"
From NAMIC Wiki
Line 39: | Line 39: | ||
==Robot Control== | ==Robot Control== | ||
− | *robot control from Slicer | + | *robot control from Slicer (POSITION CLEAR, Work for TUESDAY) |
− | *robot control from RadVision | + | *robot control from RadVision (POSITION CLEAR, for TUESDAY) |
==Device placement== | ==Device placement== | ||
*Needle | *Needle | ||
*Seeds | *Seeds |
Revision as of 21:00, 8 December 2008
Home < 2008 IGT Project Week Prostate Breakout SessionBack to 2008 IGT Project Week
Moderator:
- Noby Hata
Attendees:
Agenda:
- Final walk through of the steps
Setup
- Power supply
- Cable (Eithernet, power)
- Robot and the associated computers
- MRI
- Slicer and associated computers
- Radvision
- network (IP address?)
- compresso (connector needs to be checked ?)
- monitor (how many, where?) (needs one from Monitor)
- phantom
- Coil
Localiser
- Image transfer (DICOM OK)
- Z-frame and calibration (Jack was able to get good registration.
- Open IGT Link image transfer (Tonight, may continue to tomorrow)
- transferring calibration result (open igt link CLEAR)
Planning
- Planning in Slicer (based DICOM, clear, CLEAR)
- Planning in RadVision
Scan Control
- Scan control from Slicer
- Scan control from Radvision
Robot Control
- robot control from Slicer (POSITION CLEAR, Work for TUESDAY)
- robot control from RadVision (POSITION CLEAR, for TUESDAY)
Device placement
- Needle
- Seeds