Difference between revisions of "Engineering:UCLA"

From NAMIC Wiki
Jump to: navigation, search
Line 9: Line 9:
 
# attended dissemination workshops [[Dissemination:Workshop_Dec9-10_Boston|2004-12-9 Boston]] and [[Dissemination:Workshop_Feb17-18_2005|2005-2-18 UCSD]]
 
# attended dissemination workshops [[Dissemination:Workshop_Dec9-10_Boston|2004-12-9 Boston]] and [[Dissemination:Workshop_Feb17-18_2005|2005-2-18 UCSD]]
 
# attended NAMIC AHM at SLC Utah, January 2006
 
# attended NAMIC AHM at SLC Utah, January 2006
#Latest build/documentation available at: [[http://pipeline.loni.ucla.edu/|LONIPipeline]]
+
#Latest build/documentation available at: [[http://pipeline.loni.ucla.edu/]|LONIPipeline]
 
--
 
--

Revision as of 20:03, 8 March 2007

Home < Engineering:UCLA
  1. Attended NAMIC AHM, SLC Utah, January 2007
  2. Attended NAMIC Programming/Project Week @ MIT, June 2006
  3. Pipeline version 4.0 with Client-Server capabilities now available
  4. Scalable server which handles 1000's of inputs
  5. Default visualization component in Pipeline package
  6. Pipeline Batch mode available - Slicer can now invoke Pipeline in batch-mode with pre-bound workflows
  7. Integration with IDA, other protocol/software suites in progress
  8. built NAMIC software installation pipelines
  9. attended dissemination workshops 2004-12-9 Boston and 2005-2-18 UCSD
  10. attended NAMIC AHM at SLC Utah, January 2006
  11. Latest build/documentation available at: [[1]|LONIPipeline]

--