Difference between revisions of "2017 Project Week Template"

From NAMIC Wiki
Jump to: navigation, search
(First draft of the project page)
 
(9 intermediate revisions by 5 users not shown)
Line 3: Line 3:
 
Image:PW-Winter2017.png|link=2017_Winter_Project_Week#Projects|[[2017_Winter_Project_Week#Projects|Projects List]]
 
Image:PW-Winter2017.png|link=2017_Winter_Project_Week#Projects|[[2017_Winter_Project_Week#Projects|Projects List]]
 
<!-- Use the "Upload file" link on the left and then add a line to this list like "File:MyAlgorithmScreenshot.png" -->
 
<!-- Use the "Upload file" link on the left and then add a line to this list like "File:MyAlgorithmScreenshot.png" -->
 +
 
</gallery>
 
</gallery>
  
 
==Key Investigators==
 
==Key Investigators==
* Andras Lasso (Queen's University, Canada)
+
<!-- Add a bulleted list of investigators and their institutions here -->
* Simon Drouin (Montreal Neurological Institute, Canada)
 
* Junichi Tokuda (Brigham and Women's Hospital, Harvard Medical School, USA)
 
* Longquan Chen (Brigham and Women's Hospital, Harvard Medical School, USA)
 
* Adam Rankin (Robarts Research Institute, Canada)
 
  
 
==Project Description==
 
==Project Description==
Line 20: Line 17:
 
|
 
|
 
<!-- Objective bullet points -->
 
<!-- Objective bullet points -->
* [http://www.plustoolkit.org Plus toolkit] provides access to numerous hardware devices (imaging devices, tracking devices, navigations systems, sensors, etc.) and makes it available through [http://www.openigtlink.org OpenIGTLink] protocol
+
*  
* Create a common library that makes communication with Plus (and OpenIGTLink-compatible devices or software) very simple:
 
** Ensure software interoperability
 
** Share software maintenance workload
 
** Make it easy to share new features
 
* Add specific features for tracked ultrasound and surgical navigation
 
 
|
 
|
 
<!-- Approach and Plan bullet points -->
 
<!-- Approach and Plan bullet points -->
* Finish implementation of remote control of PlusServerLauncher
+
*  
* Implement the ultrasound control messages
 
* Merge IGSIO\OpenIGTLink into OpenIGTLink and close IGSIO\OpenIGTLink
 
 
|
 
|
<!-- Progress and Next steps bullet points (fill out at the end of project week -->
+
<!-- Progress and Next steps bullet points (fill out at the end of project week) -->
 
*
 
*
 
|}
 
|}

Latest revision as of 15:59, 13 January 2017

Home < 2017 Project Week Template

Key Investigators

Project Description

Objective Approach and Plan Progress and Next Steps

Background and References