Difference between revisions of "Project Week Logistics Checklist"

From NAMIC Wiki
Jump to: navigation, search
 
(5 intermediate revisions by 4 users not shown)
Line 1: Line 1:
 
Onsite Needs:
 
Onsite Needs:
  
*[[Media:Grier_setup_2007-3.doc|Grier Layout to accomodate 70 people and 10-12 tables]]
+
*[[Media:Grier_setup_2007-3.doc|Grier Layout to accomodate 70 people and 10-12 tables]] FINAL
*powerstrips for each table (10-12)
+
*powerstrips for each table (15) CONFIRMED
*extension cords
+
*extension cords (8) CONFIRMED
 
*4 projectors:
 
*4 projectors:
**Training Core has a NA-MIC projector  
+
**Training Core has a NA-MIC projector CONFIRMED
**Steve Pieper has a 800x600 projector  
+
**Steve Pieper has a 800x600 projector CONFIRMED
**Brad Davis can bring a projector from Kitware south
+
**Brad Davis can bring a projector from Kitware south CONFIRMED
**Two projectors from MIT
+
**Two projectors from MIT CONFIRMED
 
*speakerphone for conference calls?
 
*speakerphone for conference calls?

Latest revision as of 19:43, 20 June 2007

Home < Project Week Logistics Checklist

Onsite Needs:

  • Grier Layout to accomodate 70 people and 10-12 tables FINAL
  • powerstrips for each table (15) CONFIRMED
  • extension cords (8) CONFIRMED
  • 4 projectors:
    • Training Core has a NA-MIC projector CONFIRMED
    • Steve Pieper has a 800x600 projector CONFIRMED
    • Brad Davis can bring a projector from Kitware south CONFIRMED
    • Two projectors from MIT CONFIRMED
  • speakerphone for conference calls?