Difference between revisions of "Engineering:UCLA"

From NAMIC Wiki
Jump to: navigation, search
m (Update from Wiki)
 
 
(23 intermediate revisions by 4 users not shown)
Line 1: Line 1:
# built NAMIC software [[InstallationPipelines|installation pipelines]]
+
Back to [[Engineering:Main|NA-MIC Engineering]]
# built integrated visualization component
+
 
# attended dissemination workshops [[Dissemination:Workshop_Dec9-10_Boston|2004-12-9 Boston]] and [[Dissemination:Workshop_Feb17-18_2005|2005-2-18 UCSD]]
+
=UCLA (PI: [http://www.loni.usc.edu/about_loni/people/indiv_detail.php?people_id=220 Jack Van Horn])=
# attended NAMIC AHM at SLC
+
 
 +
 
 +
<br>
 +
#Completed Slicer command-line module for fluid mechanics DTI tractography method (beta testing; release date: September 2009)
 +
#Slicer-BrainLab UCLA Neurosurgery Pilot Study (Initial Meeting with IGT group) 
 +
#Attended NAMIC Programming Project Week @ MIT, June 2009
 +
#Attended NAMIC AHM, SLC Utah, January 2009
 +
#Attended NAMIC Programming Project Week @ MIT, June 2008
 +
#Completed ITK compatible fluid mechanics DTI tractography method
 +
#Attended NAMIC AHM, SLC Utah, January 2008
 +
#Attended NAMIC Programming Project Week @ MIT, June 2007
 +
#Attended NAMIC AHM, SLC Utah, January 2007
 +
#Attended NAMIC Programming Project Week @ MIT, June 2006
 +
#Pipeline version 4.0 with Client-Server capabilities now available
 +
#Scalable Server which handles 1000's of inputs
 +
#Default Visualization Component in Pipeline package
 +
#Pipeline Batch mode available - Slicer can now invoke Pipeline in batch-mode with pre-bound workflows
 +
#Integration with IDA, other protocol/software suites in progress
 +
#Built NAMIC software [[InstallationPipelines|installation pipelines]]
 +
#Attended dissemination workshops [[Dissemination:Workshop_Dec9-10_Boston|2004-12-9 Boston]] and [[Dissemination:Workshop_Feb17-18_2005|2005-2-18 UCSD]]
 +
#Attended NAMIC AHM at SLC Utah, January 2006
 +
#Latest build/documentation available at [http://pipeline.loni.ucla.edu/ LONI UCLA]
 +
--

Latest revision as of 22:15, 3 June 2014

Home < Engineering:UCLA

Back to NA-MIC Engineering

UCLA (PI: Jack Van Horn)


  1. Completed Slicer command-line module for fluid mechanics DTI tractography method (beta testing; release date: September 2009)
  2. Slicer-BrainLab UCLA Neurosurgery Pilot Study (Initial Meeting with IGT group)
  3. Attended NAMIC Programming Project Week @ MIT, June 2009
  4. Attended NAMIC AHM, SLC Utah, January 2009
  5. Attended NAMIC Programming Project Week @ MIT, June 2008
  6. Completed ITK compatible fluid mechanics DTI tractography method
  7. Attended NAMIC AHM, SLC Utah, January 2008
  8. Attended NAMIC Programming Project Week @ MIT, June 2007
  9. Attended NAMIC AHM, SLC Utah, January 2007
  10. Attended NAMIC Programming Project Week @ MIT, June 2006
  11. Pipeline version 4.0 with Client-Server capabilities now available
  12. Scalable Server which handles 1000's of inputs
  13. Default Visualization Component in Pipeline package
  14. Pipeline Batch mode available - Slicer can now invoke Pipeline in batch-mode with pre-bound workflows
  15. Integration with IDA, other protocol/software suites in progress
  16. Built NAMIC software installation pipelines
  17. Attended dissemination workshops 2004-12-9 Boston and 2005-2-18 UCSD
  18. Attended NAMIC AHM at SLC Utah, January 2006
  19. Latest build/documentation available at LONI UCLA

--