Difference between revisions of "4DUSandEndoscope"

From NAMIC Wiki
Jump to: navigation, search
Tag: 2017 source edit
 
(4 intermediate revisions by one other user not shown)
Line 105: Line 105:
 
=== General To Do ===
 
=== General To Do ===
  
{|border="0", cellpadding="5"
+
{|border="0" cellpadding="5"
  
 
|- bgcolor="silver"
 
|- bgcolor="silver"
Line 149: Line 149:
 
* Responsible: Jan Gumprecht
 
* Responsible: Jan Gumprecht
 
=== Details ===
 
=== Details ===
 +
* The module is available through svn: http://svn.na-mic.org/NAMICSandBox/trunk/IGTLoadableModules/4DUsEndoNav/
  
 
=== Progress ===
 
=== Progress ===
Line 177: Line 178:
  
 
|height="10px" |
 
|height="10px" |
 +
 +
|-
 +
 +
| width="80px"| || colspan="2" width="550px"| Source Code checked in to svn ||align="center" width="50px" |  x || width="120px" |  Thu, Aug 6th
  
 
|-
 
|-
Line 212: Line 217:
 
=== To Do ===
 
=== To Do ===
  
{|border="0", cellpadding="5"
+
{|border="0" cellpadding="5"
  
 
|- bgcolor="silver"
 
|- bgcolor="silver"
Line 228: Line 233:
 
|-
 
|-
  
| align="center" width="70px" | Done || align="left" | Include Second Window source code
+
| align="center" width="70px" bgcolor="#009900" | DONE || align="left" | Check in source to svn
 +
 
 +
|-
 +
 
 +
| align="center" width="70px" bgcolor="#009900" | DONE || align="left" | Include Second Window source code
  
 
|-
 
|-
  
| align="center" width="70px" | DONE || align="left"| Create first prototyp of module, i.e. adapt IGTWizard Module
+
| align="center" width="70px" bgcolor="#009900" | DONE || align="left"| Create first prototyp of module, i.e. adapt IGTWizard Module
  
 
|-
 
|-
Line 322: Line 331:
 
=== To Do ===
 
=== To Do ===
  
{|border="0", cellpadding="5"
+
{|border="0" cellpadding="5"
  
 
|- bgcolor="silver"
 
|- bgcolor="silver"
Line 422: Line 431:
 
=== To Do ===
 
=== To Do ===
  
{|border="0", cellpadding="5"
+
{|border="0" cellpadding="5"
  
 
|- bgcolor="silver"
 
|- bgcolor="silver"
Line 521: Line 530:
 
=== To Do ===
 
=== To Do ===
  
{|border="0", cellpadding="5"
+
{|border="0" cellpadding="5"
  
 
|- bgcolor="silver"
 
|- bgcolor="silver"
Line 610: Line 619:
 
=== To Do ===
 
=== To Do ===
  
{|border="0", cellpadding="5"
+
{|border="0" cellpadding="5"
  
 
|- bgcolor="silver"
 
|- bgcolor="silver"

Latest revision as of 05:23, 11 April 2023

Home < 4DUSandEndoscope

Project Page for 4D Ultrasound with Endoscopic Overlay

Collaborators

Jan Gumprecht

  • E-Mail: jgumprec(at)bwh.harvard.edu
  • Location: Kyushu, Japan
  • Timezone: GMT + 9

Jae-Sung Hung, PhD

  • E-Mail: hong(at)dem.med.kyushu-u.ac.jp
  • Location: Kyushu, Japan
  • Timezone: GMT + 9

Nobuhiko Hata, PhD

  • E-Mail: hata(at)bwh.harvard.edu
  • Location: Boston, USA
  • Timezone: GMT - 5

Haiying Liu

  • E-Mail: hliu(at)bwh.harvard.edu
  • Location: Boston, USA
  • Timezone: GMT - 5

Yamada Atsushi, PhD

  • E-Mail: yamada.atsushi(at)nitech.ac.jp
  • Location: Nagoya, Japan
  • Timezone: GMT + 9

Project Description

The goal of this project is to create a new 3D Slicer Module that can overlay patient registered 4D US volumes with endoscopic images.

The Project is divided into four part: 4D Ultrasound Volume Reconstruction, Patient-Image Registration, Endoscope Overlay, and Endoscope Calibration. All four parts will be accessable through a single 3D Slicer Module.

ModuleWorkflow.png

Overall Progress

Month Week # Start Date - End Date Done Date Done
Week 34 17.08 - 23.08
Week 33 10.08 - 16.08
Endoscopic Overlay and Endoscopic Calibration shall be finished
August Week 32 03.08.09 - 09.08.09
New PC set up x Thu Jul, 30th
New PC arrived x Tue Jul, 28th
Week 31 27.07 - 02.08
Project Page created x Fri Jul, 24th
July Week 30 20.07.09 - 26.07.09

General To Do

Tasks
O Fill Project Page with Information
O Order new Frame Grabber Card
DONE Set Up New Computer
DONE Order new PC
DONE Create Project Page

Details

  • The following frame grabber card only provides grayscale images: I-O DATA GV-VCP3R/PCI (video decoder chip CX2388x) [1]




3D Slicer Module

  • Responsible: Jan Gumprecht

Details

Progress

Month Week # Start Date - End Date Done Date Done
Week 34 17.08 - 23.08
Week 33 10.08 - 16.08
Source Code checked in to svn x Thu, Aug 6th
Second Window works x Thu, Aug 6th
August Week 32 03.08.09 - 09.08.09
Created First prototype of module x Fri, Jul 31st
Week 31 27.07 - 02.08
July Week 30 20.07.09 - 26.07.09

To Do

Tasks
O Close Second window with OS native commands, i.e. click the "X" in the right upper corner
O Comprehend Prostate nav module's source code
DONE Check in source to svn
DONE Include Second Window source code
DONE Create first prototyp of module, i.e. adapt IGTWizard Module




4D Ultrasound Volume Reconstruction

  • Responsible: Jan Gumprecht

Details

The project is described here: [[2]]

Progress

Month Week # Start Date - End Date Done Date Done
Week 34 17.08 - 23.08
Week 33 10.08 - 16.08
August Week 32 03.08.09 - 09.08.09
Update Calibration and Spacing Handeling
New Commandline parameter added to grab a test image x Tue, Jul 30th
All parameters of the calibration file are now used x Tue, Jul 28th
OpenIGTLink is now externally, no local copy within the source code is used anymore x Mon, Jul 27th
Week 31 27.07 - 02.08
Show demo of the system
July Week 30 20.07.09 - 26.07.09

To Do

Tasks
O Find Segmentation Fault
O Update Handling of Spacing
O Update Calibration Part
DONE Set up existing Hardware for first demo
DONE Update CalibrationFileReader




Patient-Image Registration

  • Responsible: Jae-Sung Hong

Details

Progress

Month Week # Start Date - End Date Done Date Done
Week 34 17.08 - 23.08
Week 33 10.08 - 16.08
August Week 32 03.08.09 - 09.08.09
Start integration with 4D Ultrasound
Week 31 27.07 - 02.08


July Week 30 20.07.09 - 26.07.09

To Do

Tasks
O Dummy Task




Endoscope Overlay

  • Responsible: Yamada Atsushi, Haiying Liu

Details

Bug Fixes for the 3D Slicer Module

  • There is a bug in OpenCV related to V4L2 devices:
    • Here is the bugtrac with information: [[3]]
      • Somehow this is related to bttv 878 cards. OpenCV seem not to be able to handle all output of the card correctly
    • Here is the fix [[4]]
      • Apply the changes of revision 1609 to the file # opencv/src/highgui/cvcap_v4l.cpp

Progress

Month Week # Start Date - End Date Done Date Done
Week 34 17.08 - 23.08
Week 33 10.08 - 16.08
Endoscopic Overlay shall be finished
August Week 32 03.08.09 - 09.08.09
Week 31 27.07 - 02.08
July Week 30 20.07.09 - 26.07.09

To Do

Tasks
O Dummy Task
Endoscope overlay




Endoscope Calibration

  • Responsible: Dr. Yang

Details

Progress

Month Week # Start Date - End Date Done Date Done
Week 34 17.08 - 23.08
Week 33 10.08 - 16.08
Endoscopic Calibration shall be finished
August Week 32 03.08.09 - 09.08.09
Week 31 27.07 - 02.08
July Week 30 20.07.09 - 26.07.09

To Do

Tasks
O Dummy Task