Difference between revisions of "Engineering:UCLA"
From NAMIC Wiki
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
Back to [[Engineering:Main|NA-MIC Engineering]] | Back to [[Engineering:Main|NA-MIC Engineering]] | ||
+ | |||
+ | =UCLA (PI: [http://www.loni.usc.edu/about_loni/people/indiv_detail.php?people_id=220 Jack Van Horn])= | ||
+ | |||
+ | |||
+ | <br> | ||
#Completed Slicer command-line module for fluid mechanics DTI tractography method (beta testing; release date: September 2009) | #Completed Slicer command-line module for fluid mechanics DTI tractography method (beta testing; release date: September 2009) | ||
#Slicer-BrainLab UCLA Neurosurgery Pilot Study (Initial Meeting with IGT group) | #Slicer-BrainLab UCLA Neurosurgery Pilot Study (Initial Meeting with IGT group) | ||
Line 11: | Line 16: | ||
#Attended NAMIC Programming Project Week @ MIT, June 2006 | #Attended NAMIC Programming Project Week @ MIT, June 2006 | ||
#Pipeline version 4.0 with Client-Server capabilities now available | #Pipeline version 4.0 with Client-Server capabilities now available | ||
− | #Scalable | + | #Scalable Server which handles 1000's of inputs |
− | #Default | + | #Default Visualization Component in Pipeline package |
#Pipeline Batch mode available - Slicer can now invoke Pipeline in batch-mode with pre-bound workflows | #Pipeline Batch mode available - Slicer can now invoke Pipeline in batch-mode with pre-bound workflows | ||
#Integration with IDA, other protocol/software suites in progress | #Integration with IDA, other protocol/software suites in progress | ||
− | # | + | #Built NAMIC software [[InstallationPipelines|installation pipelines]] |
− | # | + | #Attended dissemination workshops [[Dissemination:Workshop_Dec9-10_Boston|2004-12-9 Boston]] and [[Dissemination:Workshop_Feb17-18_2005|2005-2-18 UCSD]] |
− | # | + | #Attended NAMIC AHM at SLC Utah, January 2006 |
− | #Latest build/documentation available at | + | #Latest build/documentation available at [http://pipeline.loni.ucla.edu/ LONI UCLA] |
-- | -- |
Latest revision as of 22:15, 3 June 2014
Home < Engineering:UCLABack to NA-MIC Engineering
UCLA (PI: Jack Van Horn)
- Completed Slicer command-line module for fluid mechanics DTI tractography method (beta testing; release date: September 2009)
- Slicer-BrainLab UCLA Neurosurgery Pilot Study (Initial Meeting with IGT group)
- Attended NAMIC Programming Project Week @ MIT, June 2009
- Attended NAMIC AHM, SLC Utah, January 2009
- Attended NAMIC Programming Project Week @ MIT, June 2008
- Completed ITK compatible fluid mechanics DTI tractography method
- Attended NAMIC AHM, SLC Utah, January 2008
- Attended NAMIC Programming Project Week @ MIT, June 2007
- Attended NAMIC AHM, SLC Utah, January 2007
- Attended NAMIC Programming Project Week @ MIT, June 2006
- Pipeline version 4.0 with Client-Server capabilities now available
- Scalable Server which handles 1000's of inputs
- Default Visualization Component in Pipeline package
- Pipeline Batch mode available - Slicer can now invoke Pipeline in batch-mode with pre-bound workflows
- Integration with IDA, other protocol/software suites in progress
- Built NAMIC software installation pipelines
- Attended dissemination workshops 2004-12-9 Boston and 2005-2-18 UCSD
- Attended NAMIC AHM at SLC Utah, January 2006
- Latest build/documentation available at LONI UCLA
--