Difference between revisions of "AHM 2007 Schedule Test"

From NAMIC Wiki
Jump to: navigation, search
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
{| style="color:black"
+
Moved to [[AHM_2007]]
|-
 
| bgcolor="yellow"|Time || bgcolor="red"|Wednesday || width="300" bgcolor="blue"|Thursday || bgcolor="green"|Friday
 
|}
 
 
 
{| border="1"
 
|-
 
||Time ||  width="300"|Wednesday || width="300"|Thursday || width="300"|Friday
 
|-
 
||7:30-8:00 || || Breakfast || Breakfast
 
|-
 
||8:00-9:00 || Breakfast  || [[AHM 2007 Introduction and Administrative Update|Introduction and Adminstrative Update]] (R. Kikinis)
 
|| Project Work
 
|-
 
||9:00-10:30 || Slicer3 Tutorial (J. Miller, S. Pieper)||  ||Project Work
 
|-
 
||10:30-11:00 || Coffee ||Coffee  ||Coffee
 
|-
 
||11:00-12:00 || [[AHM 2007:Slicer3 Developer Feedback|Slicer3 Developer Feedback: How IGT, DTI, and EM groups are using Slicer3]] (B. Davis, K.Pohl, L.O'Donnell, R. San Jose) ||  || Project Work
 
|-
 
||12:00-1:00 || Lunch || Lunch || Lunch
 
|-
 
||1:00-2:00 || Project Introductions (J. Miller) ||  || Project Work
 
|-
 
||2:00-3:30
 
|| Project Work
 
 
 
Breakout Session: EM Segmentation Tutorial (K. Pohl, B. Davis)
 
||  ||
 
|-
 
||3:30-4:00 || Coffee ||Coffee  ||Adjourn
 
|-
 
||4:00-5:30 || Project Work ||  ||
 
|-
 
||5:30-7:00 || [[AHM_2007:Core_1_2_Site_PI_Mid_Cycle_Review|Mid Cycle Review with Core 1&2 Site PIs]] ||  ||
 
 
 
|}
 
 
 
 
 
This is a draft of the agenda for the AHM.
 
 
 
=== Wednesday, Jan 10 2007:[[2007_Project_Half_Week|Project Activities]] ===
 
 
 
*8:00-9:00 - Breakfast
 
*9:00-11:00 - Slicer3 Tutorial (Steve Pieper, Jim Miller)
 
*11:00-12:00 - [[AHM 2007:Slicer3 Developer Feedback|Slicer3 Developer Feedback: How IGT, DTI, and EM groups are using Slicer3]] (Brad Davis, Kilian Pohl, Lauren O'Donnell, Raul San Jose)
 
*12:00-1:00 - Lunch
 
*1:00-2:00 - Project Introductions (Jim Miller to Lead)
 
*2:00-5:30 - Project Work (with Coffee Break at 15:30)
 
*2:00-3:00 - Breakout Session: EM Segmentation Tutorial (Kilian Pohl, Brad Davis)
 
*5:30-7:30 - [[AHM_2007:Core_1_2_Site_PI_Mid_Cycle_Review|Mid Cycle Review with Core 1&2 Site PIs]]
 
 
 
=== Thursday, Jan 11 2007: One-day AHM ===
 
 
 
'''Morning: Updates on On-going Projects''', (aka 'goodbye for the current DBP's')
 
 
 
*07.30-08.00: Breakfast
 
*08.00-08.30: [[AHM 2007 Introduction and Administrative Update|Introduction and Adminstrative Update]] (Ron)
 
*08.30-09.00: NA-MIC Kit Update (Bill)
 
*09.00-09.15: discussion (led by Guido Gerig)
 
*09.15-09.45: DTI Theme Update (Ross Whitaker)
 
*09.45-10.00: discussion (led by Marty Shenton)
 
*10.00-10.30: Break
 
*10.30-11.00: Structural Analysis Theme Update (Martin Styner)
 
*11.00-11.15: discussion (led by Allen Tannenbaum)
 
*11.15-11.30: fMRI Theme Update (Polina Golland)
 
*11.30-11.45: discussion (led by Andy Saykin)
 
*11.45-12.15: Outreach, Training (Randy)
 
*12.15-01.15: Lunch break
 
 
 
'''Afternoon: The new DBP's: Projects and plans'''
 
*1.15-1.45: Harvard: VCFS as a genetic model for schizophrenia (M. Kubicki)
 
*1.45-2.00: discussion
 
*2.00-2.20: JHU: Image guided prostate interventions (G. Fichtinger)
 
*2.20-2.35: discussion
 
*2.35-2.55: The Mind Institute: Vascular Components of Brain Disorders (J. Bockholt)
 
*2.55-3.10: discussion
 
*3.10-3.30: UNC: Longitudinal MRI study of early brain development (H. Cody)
 
*3.30-3.45: discussion
 
*3.45-4.00: Outreach, Training, conclusion (Ron)
 
*4.00-4.15: UIowa Collaboration Grant (N. Grosland, V. Magnotta)
 
*4.15-4.30: XIP: Open source application development environment in caBIG (F. Prior, EAB)
 
*4.30-5.00: discussion (Ron, Ross, Bill)
 
 
 
*5.00-5.30: [[AHM_2007:NIH_Panel_Discussion|NIH Lead Q&A]] (G. Peng, M. Ackerman)
 
 
 
=== Friday, Jan 12 2007: 08.00am-12.00 [[EAB_Meeting|2007 EAB]] ===
 
 
 
=== Friday, Jan 12 2007: [[2007_Project_Half_Week|Project Activities]] ===
 
 
 
*7:30-8:00 Breakfast
 
*8:00-12:00 Project Work
 
*10:30-11:00 Coffee Break
 
*12:00-13:00 Lunch
 
*13:00-15:00 Project Work
 
*15:00pm Adjourn
 

Latest revision as of 13:45, 2 January 2007

Home < AHM 2007 Schedule Test

Moved to AHM_2007