Difference between revisions of "2008-SCI-tour"

From NAMIC Wiki
Jump to: navigation, search
Line 5: Line 5:
 
=Tour of the Scientific Computing and Imaging (SCI) Institute=
 
=Tour of the Scientific Computing and Imaging (SCI) Institute=
  
The SCI Institute (www.sci.utah.edu) recently moved into the new Warnock Engineering Building at the University of Utah.
+
The SCI Institute (http://www.sci.utah.edu) recently moved into the new Warnock Engineering Building at the University of Utah.
  
 
Please join us for a short tour of our new space.
 
Please join us for a short tour of our new space.
 
 
  
 
=Logistics=
 
=Logistics=

Revision as of 18:50, 31 December 2007

Home < 2008-SCI-tour


Back to AHM_2008, Events

Tour of the Scientific Computing and Imaging (SCI) Institute

The SCI Institute (http://www.sci.utah.edu) recently moved into the new Warnock Engineering Building at the University of Utah.

Please join us for a short tour of our new space.

Logistics

We have rented a van/bus that will hold 20 people and take people from the Marriott Hotel to the SCI Institute and then back again to the Hotel.

The first 20 people to sign up will be able to ride on the van/bus. Others who would like to join us can car pool.

Here is a map and directions to the SCI Institute (Warnock Engineering Building). It is about a 10 minute drive from the Hotel to the SCI Institute.

http://www.sci.utah.edu/map.html

List of Participants

Please add your name to the bottom of the list, if you intend to participate in the tour.

  1. Ron Kikinis