Difference between revisions of "2008 IGT Project Week Prostate Breakout Session"

From NAMIC Wiki
Jump to: navigation, search
Line 1: Line 1:
Back to [[2008 IGT Project Week]]
+
Back to [[2008 IGT Project Week]]
  
 
Moderator:
 
Moderator:
Line 11: Line 11:
  
 
==Setup==
 
==Setup==
**Robot
+
**Power supply
**MRI control
+
**Cable (Eithernet, power)
**Slicer
+
**Robot and the associated computers
 +
**MRI  
 +
**Slicer and associated computers
 
**Radvision
 
**Radvision
**network
+
**network (IP address?)
 
**compressor
 
**compressor
**monitor
+
**monitor (how many, where?)
 
**phantom
 
**phantom
 
**Coil
 
**Coil
 
  
 
==Localiser==
 
==Localiser==

Revision as of 19:30, 8 December 2008

Home < 2008 IGT Project Week Prostate Breakout Session

Back to 2008 IGT Project Week

Moderator:

  • Noby Hata

Attendees:


Agenda:

  • Final walk through of the steps

Setup

    • Power supply
    • Cable (Eithernet, power)
    • Robot and the associated computers
    • MRI
    • Slicer and associated computers
    • Radvision
    • network (IP address?)
    • compressor
    • monitor (how many, where?)
    • phantom
    • Coil

Localiser

  • Z-frame and calibration
  • calibration result (open igt link)

Planning

  • Planning in Slicer
  • Planning in RadVision

Scan Control

  • Scan control from Slicer
  • Scan control from Radvision

Robot Control

  • robot control from Slicer
  • robot control from RadVision

Device placement

  • Needle
  • Seeds