Difference between revisions of "2008 IGT Project Week Prostate Breakout Session"
From NAMIC Wiki
(→Setup) |
|||
Line 1: | Line 1: | ||
− | + | Back to [[2008 IGT Project Week]] | |
Moderator: | Moderator: | ||
Line 11: | Line 11: | ||
==Setup== | ==Setup== | ||
− | **Robot | + | **Power supply |
− | **MRI | + | **Cable (Eithernet, power) |
− | **Slicer | + | **Robot and the associated computers |
+ | **MRI | ||
+ | **Slicer and associated computers | ||
**Radvision | **Radvision | ||
− | **network | + | **network (IP address?) |
**compressor | **compressor | ||
− | **monitor | + | **monitor (how many, where?) |
**phantom | **phantom | ||
**Coil | **Coil | ||
− | |||
==Localiser== | ==Localiser== |
Revision as of 19:30, 8 December 2008
Home < 2008 IGT Project Week Prostate Breakout SessionBack to 2008 IGT Project Week
Moderator:
- Noby Hata
Attendees:
Agenda:
- Final walk through of the steps
Setup
- Power supply
- Cable (Eithernet, power)
- Robot and the associated computers
- MRI
- Slicer and associated computers
- Radvision
- network (IP address?)
- compressor
- monitor (how many, where?)
- phantom
- Coil
Localiser
- Z-frame and calibration
- calibration result (open igt link)
Planning
- Planning in Slicer
- Planning in RadVision
Scan Control
- Scan control from Slicer
- Scan control from Radvision
Robot Control
- robot control from Slicer
- robot control from RadVision
Device placement
- Needle
- Seeds