Difference between revisions of "2008 IGT Project Week Prostate Breakout Session"
From NAMIC Wiki
(→Setup) |
|||
Line 25: | Line 25: | ||
==Localiser== | ==Localiser== | ||
*Z-frame and calibration | *Z-frame and calibration | ||
− | *calibration result (open igt link) | + | *transfering calibration result (open igt link) |
==Planning== | ==Planning== |
Revision as of 19:31, 8 December 2008
Home < 2008 IGT Project Week Prostate Breakout SessionBack to 2008 IGT Project Week
Moderator:
- Noby Hata
Attendees:
Agenda:
- Final walk through of the steps
Setup
- Power supply
- Cable (Eithernet, power)
- Robot and the associated computers
- MRI
- Slicer and associated computers
- Radvision
- network (IP address?)
- compressor
- monitor (how many, where?)
- phantom
- Coil
Localiser
- Z-frame and calibration
- transfering calibration result (open igt link)
Planning
- Planning in Slicer
- Planning in RadVision
Scan Control
- Scan control from Slicer
- Scan control from Radvision
Robot Control
- robot control from Slicer
- robot control from RadVision
Device placement
- Needle
- Seeds