Difference between revisions of "2008 Engineering review at Utah"

From NAMIC Wiki
Jump to: navigation, search
Line 2: Line 2:
  
 
The date is now set at: March 24-27, 2008.
 
The date is now set at: March 24-27, 2008.
 +
 +
Proposed discussion items:
 +
 +
* DTI processing modules/pipeline
 +
** Infrastructure for DWI/DTI data types
 +
*** How to handle coordinate frames
 +
** Preprocessing pipeline for DWI->DTI->analysis
 +
*** Filtering
 +
*** Registration
 +
*** Estimation
 +
*** White mater mask
 +
*** User interfaces/interaction
 +
** Analysis of DTI data
 +
*** Tractography
 +
*** Atlases
 +
*** Derived quantities
 +
*** Hypothesis testing
 +
 +
* Shape analysis pipeline (Should Martin S. be here?)
 +
** How to organize data
 +
** How to break pipeline in to steps
 +
*** Segmentation, preprocessing, parameterization, visualization
 +
** How to accommodate new modules/techniques
 +
 +
* The general problem of registration and atlases
 +
** Status of spline-based methods
 +
** Intertability

Revision as of 22:12, 29 February 2008

Home < 2008 Engineering review at Utah

Will, Ross, and Guido will consult with other people and schedule the event.

The date is now set at: March 24-27, 2008.

Proposed discussion items:

  • DTI processing modules/pipeline
    • Infrastructure for DWI/DTI data types
      • How to handle coordinate frames
    • Preprocessing pipeline for DWI->DTI->analysis
      • Filtering
      • Registration
      • Estimation
      • White mater mask
      • User interfaces/interaction
    • Analysis of DTI data
      • Tractography
      • Atlases
      • Derived quantities
      • Hypothesis testing
  • Shape analysis pipeline (Should Martin S. be here?)
    • How to organize data
    • How to break pipeline in to steps
      • Segmentation, preprocessing, parameterization, visualization
    • How to accommodate new modules/techniques
  • The general problem of registration and atlases
    • Status of spline-based methods
    • Intertability