Difference between revisions of "2008 IGT Project Week Prostate Breakout Session"

From NAMIC Wiki
Jump to: navigation, search
Line 12: Line 12:
 
==Setup==
 
==Setup==
 
**Power supply
 
**Power supply
**Cable (Eithernet, power)
+
**Cable (Eithernet, power)  
 
**Robot and the associated computers
 
**Robot and the associated computers
 
**MRI  
 
**MRI  
**Slicer and associated computers
+
**Slicer and associated computers  
 
**Radvision
 
**Radvision
**network (IP address?)
+
**network (IP address?)  
**compressor
+
**compresso (coonector needs to be checked)
**monitor (how many, where?)
+
**monitor (how many, where?) (needs one from Monitor)
**phantom
+
**phantom  
 
**Coil
 
**Coil
  

Revision as of 20:54, 8 December 2008

Home < 2008 IGT Project Week Prostate Breakout Session

Back to 2008 IGT Project Week

Moderator:

  • Noby Hata

Attendees:


Agenda:

  • Final walk through of the steps

Setup

    • Power supply
    • Cable (Eithernet, power)
    • Robot and the associated computers
    • MRI
    • Slicer and associated computers
    • Radvision
    • network (IP address?)
    • compresso (coonector needs to be checked)
    • monitor (how many, where?) (needs one from Monitor)
    • phantom
    • Coil

Localiser

  • Z-frame and calibration
  • transfering calibration result (open igt link)

Planning

  • Planning in Slicer
  • Planning in RadVision

Scan Control

  • Scan control from Slicer
  • Scan control from Radvision

Robot Control

  • robot control from Slicer
  • robot control from RadVision

Device placement

  • Needle
  • Seeds