Difference between revisions of "2008 IGT Project Week Prostate Breakout Session"
From NAMIC Wiki
(→Setup) |
|||
Line 12: | Line 12: | ||
==Setup== | ==Setup== | ||
**Power supply | **Power supply | ||
− | **Cable (Eithernet, power) | + | **Cable (Eithernet, power) |
**Robot and the associated computers | **Robot and the associated computers | ||
**MRI | **MRI | ||
− | **Slicer and associated computers | + | **Slicer and associated computers |
**Radvision | **Radvision | ||
− | **network (IP address?) | + | **network (IP address?) |
− | ** | + | **compresso (coonector needs to be checked) |
− | **monitor (how many, where?) | + | **monitor (how many, where?) (needs one from Monitor) |
− | **phantom | + | **phantom |
**Coil | **Coil | ||
Revision as of 20:54, 8 December 2008
Home < 2008 IGT Project Week Prostate Breakout SessionBack to 2008 IGT Project Week
Moderator:
- Noby Hata
Attendees:
Agenda:
- Final walk through of the steps
Setup
- Power supply
- Cable (Eithernet, power)
- Robot and the associated computers
- MRI
- Slicer and associated computers
- Radvision
- network (IP address?)
- compresso (coonector needs to be checked)
- monitor (how many, where?) (needs one from Monitor)
- phantom
- Coil
Localiser
- Z-frame and calibration
- transfering calibration result (open igt link)
Planning
- Planning in Slicer
- Planning in RadVision
Scan Control
- Scan control from Slicer
- Scan control from Radvision
Robot Control
- robot control from Slicer
- robot control from RadVision
Device placement
- Needle
- Seeds