Difference between revisions of "2008 IGT Project Week Prostate Breakout Session"
From NAMIC Wiki
Line 36: | Line 36: | ||
==Scan Control== | ==Scan Control== | ||
*Scan control from Slicer | *Scan control from Slicer | ||
− | *Scan control from Radvision | + | *Scan control from Radvision (TUESAY and Wednesday) |
==Robot Control== | ==Robot Control== |
Latest revision as of 21:02, 8 December 2008
Home < 2008 IGT Project Week Prostate Breakout SessionBack to 2008 IGT Project Week
Moderator:
- Noby Hata
Attendees:
Agenda:
- Final walk through of the steps
Setup
- Power supply
- Cable (Eithernet, power)
- Robot and the associated computers
- MRI
- Slicer and associated computers
- Radvision
- network (IP address?)
- compresso (connector needs to be checked ?)
- monitor (how many, where?) (needs one from Monitor)
- phantom
- Coil
Localiser
- Image transfer (DICOM OK)
- Z-frame and calibration (Jack was able to get good registration.
- Open IGT Link image transfer (Tonight, may continue to tomorrow)
- transferring calibration result (open igt link CLEAR)
Planning
- Planning in Slicer (based DICOM, clear, CLEAR)
- Planning in RadVision
Scan Control
- Scan control from Slicer
- Scan control from Radvision (TUESAY and Wednesday)
Robot Control
- robot control from Slicer (POSITION CLEAR, Work for TUESDAY)
- robot control from RadVision (POSITION CLEAR, for TUESDAY)
Device placement
- Needle (JHU)
- Seeds (JHU)