Difference between revisions of "Training Data Prostate Segmentation Challenge MICCAI09"
From NAMIC Wiki
Line 4: | Line 4: | ||
{| border="1" cellpadding="2" | {| border="1" cellpadding="2" | ||
− | !width=" | + | !width="75"|Patient Number |
!width="150"|T1 images | !width="150"|T1 images | ||
!width="150"|T2 images | !width="150"|T2 images | ||
!width="150"|T2 segmented images | !width="150"|T2 segmented images | ||
|- | |- | ||
− | | | + | | 1|| http://prostatemrimagedatabase.com/Database/000029/00003/001/index.html|| http://prostatemrimagedatabase.com/Database/000029/00003/002/index.html || http://prostatemrimagedatabase.com/Database/000029/00003/004/index.html |
|- | |- | ||
|- | |- |
Revision as of 16:08, 27 May 2009
Home < Training Data Prostate Segmentation Challenge MICCAI09Prostate Segmentation Challenge Training Data
The following table presents 15 datasets. Each dataset has anonymous prostate patient data corresponding to T1-weighted axial images, T2-weighted axial images and the expert segmentation of the T2-weighted images (considered gold standard). All images were taken in a 1.5T MRI scanner.
Patient Number | T1 images | T2 images | T2 segmented images |
---|---|---|---|
1 | http://prostatemrimagedatabase.com/Database/000029/00003/001/index.html | http://prostatemrimagedatabase.com/Database/000029/00003/002/index.html | http://prostatemrimagedatabase.com/Database/000029/00003/004/index.html |
File:Ablation2009-background.doc | Background and Significance 1-2 pages | March 19 | |
File:Ablation2009-rdm-sa1.doc | Research design and methods SA#1 2-3 page | March 21 | |
File:Ablation2009-rdm-sa2.doc | Research design and methods SA#2 2-3 page | March 21 | |
File:Ablation2009-rdm-sa3.doc | Research design and methods SA#3 2-3 page | March 25 | |
File:Ablation2009-prel.doc | Preliminary Studies 2 page | March 25 | |
File:Ablation2009-budget.doc | Budget component and Budget Justification | March 25 | |
Pre-submission review of the application: Submit to Pre-submission review committee | March 23 | ||
File:Ablation2009-final.doc | Assemble final draft. Proof, correct and make final adjustments | March 27 | |
Revise draft; send to Research administration Office | April 8 | ||
Submission and error correction | April 9 |