Difference between revisions of "Training Data Prostate Segmentation Challenge MICCAI09"

From NAMIC Wiki
Jump to: navigation, search
Line 4: Line 4:
  
 
{| border="1" cellpadding="2"
 
{| border="1" cellpadding="2"
!width="25"|Patient Number
+
!width="75"|Patient Number
 
!width="150"|T1 images
 
!width="150"|T1 images
 
!width="150"|T2 images
 
!width="150"|T2 images
 
!width="150"|T2 segmented images
 
!width="150"|T2 segmented images
 
|-
 
|-
| Patient|| SA 1.25 pages|| March 17
+
| 1|| http://prostatemrimagedatabase.com/Database/000029/00003/001/index.html|| http://prostatemrimagedatabase.com/Database/000029/00003/002/index.html || http://prostatemrimagedatabase.com/Database/000029/00003/004/index.html
 
|-
 
|-
 
|-
 
|-

Revision as of 16:08, 27 May 2009

Home < Training Data Prostate Segmentation Challenge MICCAI09

Prostate Segmentation Challenge Training Data

The following table presents 15 datasets. Each dataset has anonymous prostate patient data corresponding to T1-weighted axial images, T2-weighted axial images and the expert segmentation of the T2-weighted images (considered gold standard). All images were taken in a 1.5T MRI scanner.

Patient Number T1 images T2 images T2 segmented images
1 http://prostatemrimagedatabase.com/Database/000029/00003/001/index.html http://prostatemrimagedatabase.com/Database/000029/00003/002/index.html http://prostatemrimagedatabase.com/Database/000029/00003/004/index.html
File:Ablation2009-background.doc Background and Significance 1-2 pages March 19
File:Ablation2009-rdm-sa1.doc Research design and methods SA#1 2-3 page March 21
File:Ablation2009-rdm-sa2.doc Research design and methods SA#2 2-3 page March 21
File:Ablation2009-rdm-sa3.doc Research design and methods SA#3 2-3 page March 25
File:Ablation2009-prel.doc Preliminary Studies 2 page March 25
File:Ablation2009-budget.doc Budget component and Budget Justification March 25
Pre-submission review of the application: Submit to Pre-submission review committee March 23
File:Ablation2009-final.doc Assemble final draft. Proof, correct and make final adjustments March 27
Revise draft; send to Research administration Office April 8
Submission and error correction April 9