Difference between revisions of "Engineering:UCLA"

From NAMIC Wiki
Jump to: navigation, search
Line 1: Line 1:
 +
Back to [[Engineering:Main|NA-MIC Engineering]]
 
#Completed Slicer command-line module for fluid mechanics DTI tractography method (beta testing; release date: September 2009)
 
#Completed Slicer command-line module for fluid mechanics DTI tractography method (beta testing; release date: September 2009)
 
#Slicer-BrainLab UCLA Neurosurgery Pilot Study (Initial Meeting with IGT group)   
 
#Slicer-BrainLab UCLA Neurosurgery Pilot Study (Initial Meeting with IGT group)   

Revision as of 12:51, 8 February 2010

Home < Engineering:UCLA

Back to NA-MIC Engineering

  1. Completed Slicer command-line module for fluid mechanics DTI tractography method (beta testing; release date: September 2009)
  2. Slicer-BrainLab UCLA Neurosurgery Pilot Study (Initial Meeting with IGT group)
  3. Attended NAMIC Programming Project Week @ MIT, June 2009
  4. Attended NAMIC AHM, SLC Utah, January 2009
  5. Attended NAMIC Programming Project Week @ MIT, June 2008
  6. Completed ITK compatible fluid mechanics DTI tractography method
  7. Attended NAMIC AHM, SLC Utah, January 2008
  8. Attended NAMIC Programming Project Week @ MIT, June 2007
  9. Attended NAMIC AHM, SLC Utah, January 2007
  10. Attended NAMIC Programming Project Week @ MIT, June 2006
  11. Pipeline version 4.0 with Client-Server capabilities now available
  12. Scalable server which handles 1000's of inputs
  13. Default visualization component in Pipeline package
  14. Pipeline Batch mode available - Slicer can now invoke Pipeline in batch-mode with pre-bound workflows
  15. Integration with IDA, other protocol/software suites in progress
  16. built NAMIC software installation pipelines
  17. attended dissemination workshops 2004-12-9 Boston and 2005-2-18 UCSD
  18. attended NAMIC AHM at SLC Utah, January 2006
  19. Latest build/documentation available at: [1]

--