Difference between revisions of "Engineering:UCLA"
From NAMIC Wiki
Line 1: | Line 1: | ||
+ | Back to [[Engineering:Main|NA-MIC Engineering]] | ||
#Completed Slicer command-line module for fluid mechanics DTI tractography method (beta testing; release date: September 2009) | #Completed Slicer command-line module for fluid mechanics DTI tractography method (beta testing; release date: September 2009) | ||
#Slicer-BrainLab UCLA Neurosurgery Pilot Study (Initial Meeting with IGT group) | #Slicer-BrainLab UCLA Neurosurgery Pilot Study (Initial Meeting with IGT group) |
Revision as of 12:51, 8 February 2010
Home < Engineering:UCLABack to NA-MIC Engineering
- Completed Slicer command-line module for fluid mechanics DTI tractography method (beta testing; release date: September 2009)
- Slicer-BrainLab UCLA Neurosurgery Pilot Study (Initial Meeting with IGT group)
- Attended NAMIC Programming Project Week @ MIT, June 2009
- Attended NAMIC AHM, SLC Utah, January 2009
- Attended NAMIC Programming Project Week @ MIT, June 2008
- Completed ITK compatible fluid mechanics DTI tractography method
- Attended NAMIC AHM, SLC Utah, January 2008
- Attended NAMIC Programming Project Week @ MIT, June 2007
- Attended NAMIC AHM, SLC Utah, January 2007
- Attended NAMIC Programming Project Week @ MIT, June 2006
- Pipeline version 4.0 with Client-Server capabilities now available
- Scalable server which handles 1000's of inputs
- Default visualization component in Pipeline package
- Pipeline Batch mode available - Slicer can now invoke Pipeline in batch-mode with pre-bound workflows
- Integration with IDA, other protocol/software suites in progress
- built NAMIC software installation pipelines
- attended dissemination workshops 2004-12-9 Boston and 2005-2-18 UCSD
- attended NAMIC AHM at SLC Utah, January 2006
- Latest build/documentation available at: [1]
--