Difference between revisions of "CTSC:ARRA.040511"

From NAMIC Wiki
Jump to: navigation, search
Line 27: Line 27:
 
** Working on getting BWH up and running. Katie said that it is fine to have the server in Needham.
 
** Working on getting BWH up and running. Katie said that it is fine to have the server in Needham.
 
** Started options for encryption-decryption of images. Dave looked at what is supported through image J. DICOM images should work fine, offer format must be tested.
 
** Started options for encryption-decryption of images. Dave looked at what is supported through image J. DICOM images should work fine, offer format must be tested.
** Baby brain project at MGH: Bill satisfied with testing, he identified a couple of issues to be fixed. Structured reports are still missing. Time out issue: how we processed images now is c-move initiated, we wait for response and check if we got the right images. If the initiator does not get a response under 375 sec, the connection is dropped. It seems that PACS still send the images but it is not synchronized. The team is changing the logics and put together a monitoring progress to send a message that an initiation was created.
+
** Baby brain project at MGH: Bill satisfied with testing, he identified a couple of issues to be fixed.
 +
***Structured reports are still missing, they don't show up in the move. One thing to do is to check the format of those reports, maybe they are pdf, maybe they are text only in DICOM.
 +
***Time out issue: how we processed images now is c-move initiated, we wait for response and check if we got the right images. If the initiator does not get a response under 375 sec, the connection is dropped. It seems that PACS still send the images but it is not synchronized. The team is changing the logics and put together a monitoring progress to send a message that an initiation was created.

Revision as of 15:09, 5 April 2011

Home < CTSC:ARRA.040511

Back to CTSC:ARRA supplement

Harvard Catalyst Medical Informatics group Meeting Minutes April 5, 2011

In attendance:

  • Bill Wang
  • Valerie Humblet
  • Chris Herrick
  • Shawn Murphy
  • Steve Pieper
  • Vincent Roch
  • Darren Sack
  • Charles McGow
  • Alex Zeitsev
  • Bill Hanlon (phone)
  • Katie Andriole (phone)


  • Ron Kikinis
  • Yong Gao

mi2b2 software update

  • Past week lot of moving pieces:
    • Continue working on multi PACS. Bill and Chris worked out interaction with UI, need to pass back and forward institutions
    • Working on getting BWH up and running. Katie said that it is fine to have the server in Needham.
    • Started options for encryption-decryption of images. Dave looked at what is supported through image J. DICOM images should work fine, offer format must be tested.
    • Baby brain project at MGH: Bill satisfied with testing, he identified a couple of issues to be fixed.
      • Structured reports are still missing, they don't show up in the move. One thing to do is to check the format of those reports, maybe they are pdf, maybe they are text only in DICOM.
      • Time out issue: how we processed images now is c-move initiated, we wait for response and check if we got the right images. If the initiator does not get a response under 375 sec, the connection is dropped. It seems that PACS still send the images but it is not synchronized. The team is changing the logics and put together a monitoring progress to send a message that an initiation was created.