Difference between revisions of "2016 Winter Project Week/Projects/External beam planning"

From NAMIC Wiki
Jump to: navigation, search
 
Line 3: Line 3:
 
Image:PW-MIT2016.png|link=2016_Winter_Project_Week#Projects|[[2016_Winter_Project_Week#Projects|Projects List]]
 
Image:PW-MIT2016.png|link=2016_Winter_Project_Week#Projects|[[2016_Winter_Project_Week#Projects|Projects List]]
 
<!-- Use the "Upload file" link on the left and then add a line to this list like "File:MyAlgorithmScreenshot.png" -->
 
<!-- Use the "Upload file" link on the left and then add a line to this list like "File:MyAlgorithmScreenshot.png" -->
</gallery>
+
Image:2016WinterEBP.png|External Beam Planning Screenshot</gallery>
  
 
==Key Investigators==
 
==Key Investigators==

Latest revision as of 14:38, 8 January 2016

Home < 2016 Winter Project Week < Projects < External beam planning

Key Investigators

  • Greg Sharp (MGH)
  • Csaba Pinter (Queens)
  • Kevin Wang (PMH)
  • Maxime Desplanques (Politecnico di Milano)

Project Description

Objective Approach and Plan Progress and Next Steps
  • Stabilize module
  • Move from separate branch into trunk
  • Achieve final release of SlicerRT EPB module
  • Completed
    • Fix remove beam button
    • Add widget for isocenter placement options
    • Complete hookup of dose calculation engine
    • Update model and UI when isocenter changes
  • TODO
    • Update model and UI when collimation changes
    • Fix crash with multiple beams of the same name
    • Figure out engine crash when body contour used as target
    • Find a way to output beamlet doses
    • Find a way to set collimator automatically
    • Figure out why image header for target image is wrong
    • Implement dose weight point options

Background and References