Engineering:TCON 2008

From NAMIC Wiki
Jump to: navigation, search
Home < Engineering:TCON 2008

Back to TCON:Main

Slicer 3 Dartboard

Link to the Slicer 3 Dartboard here

2008-01-24

Attendees: Jim, Steve, Wendy, Xiaodong, Nicole, Katie, Alex, Luis, Ron, Will

  • Project week follow-up (Next week?)
  • Loadable modules
  • GenerateCLP - Thanks Hans
  • AHM Jan 2009, Early January 2009
  • Summer Project Week, Jun 23-27, 2008

2008-01-17

Attendees: Jim, Katie, Sebastien, Stephen, Luis, Steve, Wendy, Will

  • Luis and Bill Hoffman are making progress in making ITK installation relocatable. This is needed to finish the work on building plugins from an installation.
  • What's in VTK 5.2?
    • Infovis - Tables, Graphs, Views, IO
    • Refinements to WWidgets. Client/Server connections within the widgets. Event translation. New widgets (text, caption, affine, checkerboard, rectilinear wipe, annotation, key frame, contour, measurement, point/placer, plot)
    • Build now? Or wait until 5.2 released?
    • Repository freeze in March
    • Release on April 1, 2008
  • ITK release
    • Patches to ITK 3.4
      • Nine component/six component tensor conversion in IO has been patched to ITK 3.4
    • 1/19-2/1 moving contributions on Insight Journal for ITK 3.6
    • Move items from Review directory to main tree (QuadMesh, TransformIO) for ITK 3.6
    • Freeze repository 2/29 for ITK 3.6
    • Slicer3 will need to build against the Review directory.
  • CMake release
    • Version 2.6 on the horizon - release candidate in 3 weeks.
  • Tcl/Tk 8.5
    • Sebastien has a Windows build
    • Steve will try it out
    • Wait to switch to 8.5 until we have a good reason
  • Loadable modules
    • Sebastien - working on CMake issues on building modules as loadable modules
    • Terry - working on loading modules and reworking Slicer3.cxx
  • Event Broker
  • DWI DICOM as part of the Load Volume. Xiaodong is working on it.
  • ITKFactories directory in build and installs to hold ImageIO plugin libraries. Should increase the speed of executable plugins on the Mac.
  • OpenIGTLink
    • Protocol on the wiki (message format)
    • Put code in Sandbox, SourceForge, NITRC, Google Code???
  • Will schedule a time to go over the Project Week results

2008-01-10

No tcon due to AHM

2008-01-03

  • Attendees: Jim, Steve, Will, Brad Davis
  • Topics:
    • Jim and Will talked about leading the Monday and Friday sessions, and who would do what.
    • We are going to send out reminders to the project leads to ensure that their project descriptions are up to date
    • We discussed the software process project to make sure that we have a chance to address the Slicer build process, dashboards, etc.
    • We decided not to hold the project wrap-up presentation at AHM; we will do that later at subsequent TCons. (We decided that we needed the time to actually work. We are concerned that we are starting to see too many break-outs and not enough time to work.)
    • We keenly missed Tina and hope that she and her family are doing well.