Engineering:TCON 2013
From NAMIC Wiki
Home < Engineering:TCON 2013
Back to TCON:Main, Events
2013-1-31
Agenda:
- Python external libraries discussion (Ron, Steve, JC, Sunil)
- SSL, setuptools, etc.
- Bug report: http://na-mic.org/Bug/view.php?id=2352
- In the next TCON, Ann will review draft of engineering core progress report. All site PIs should plan to attend.
2013-01-24
Attendees: Jim, Ron, Nicole, Sunil, JC, Steve
Agenda:
- ITK v4
- ssl issues with python
Minutes:
- ITK v4
- JC found the problem with dcmtk
- Xnat folks need to install some python package => Need openssl to pip install most of the package
- What is the legal aspect of having openssl bundled ?
- OpenSSL is build by CMake folks on all platform ... it could be re-used
- Difference between ITK 3.20.0 and ITK 3.20.1. See https://github.com/Kitware/ITK/compare/v3.20.0...v3.20.1
- Talked about Stan langage. See http://mc-stan.org/
2013-01-17
Attendees: Ron, Steve, Tina, Nicole, JC, Sunil, Dave, Jim
- Project week results review: http://wiki.na-mic.org/Wiki/index.php/2013_Winter_Project_Week
Agenda:
2013-01-10
No call due to 2013_Winter_Project_Week
2013-01-03
Attendees: Jim, Steve, Stephen, Nicole, Tina,
Agenda:
- Project week: http://wiki.na-mic.org/Wiki/index.php/2013_Winter_Project_Week
- Engineering core presentation: http://wiki.na-mic.org/Wiki/index.php/AHM2013-Engineering_Updates