Difference between revisions of "AHM 2007 Introduction and Administrative Update"

From NAMIC Wiki
Jump to: navigation, search
Line 2: Line 2:
  
 
*Changes inside NA-MIC:
 
*Changes inside NA-MIC:
** Core 1: Guido is moving
+
** Core 1:  
** Core 2: PI change, Slicer3 is ready for business
+
*** Polina is site PI for MIT, Eric is senior advisor
 +
***Guido is moving to Utah
 +
** Core 2:  
 +
*** Will replaces Bill as Core 2 PI, Jim takes over the site PI function
 +
*** Slicer3 beta released at the AHM
 
** Core 3: Phasing out of existing DBP's, new DBP's
 
** Core 3: Phasing out of existing DBP's, new DBP's
** Website infrastructure
+
** Website: move to new infrastructure completed
 
** Outreach events for 2007
 
** Outreach events for 2007
 
* Collaboration grants:  
 
* Collaboration grants:  
 
** [[NA-MIC_Collaborations#PAR-05-063_Automated_FE_Mesh_Development| Iowa]] funded to do FEM Mesh Generation
 
** [[NA-MIC_Collaborations#PAR-05-063_Automated_FE_Mesh_Development| Iowa]] funded to do FEM Mesh Generation

Revision as of 00:30, 3 January 2007

Home < AHM 2007 Introduction and Administrative Update
Back to AHM_2007
  • Changes inside NA-MIC:
    • Core 1:
      • Polina is site PI for MIT, Eric is senior advisor
      • Guido is moving to Utah
    • Core 2:
      • Will replaces Bill as Core 2 PI, Jim takes over the site PI function
      • Slicer3 beta released at the AHM
    • Core 3: Phasing out of existing DBP's, new DBP's
    • Website: move to new infrastructure completed
    • Outreach events for 2007
  • Collaboration grants:
    • Iowa funded to do FEM Mesh Generation