Difference between revisions of "2009 Winter Project Week:LongitudinalLesions"
Hjbockholt (talk | contribs) |
|||
(4 intermediate revisions by 2 users not shown) | |||
Line 8: | Line 8: | ||
===Key Investigators=== | ===Key Investigators=== | ||
+ | Marcel Prastawa | ||
+ | Mark Scully, MIND | ||
+ | |||
+ | Jeremy Bockholt, MIND | ||
+ | |||
+ | Andrey Fedorov, William and Mary, BWH | ||
<div style="margin: 20px;"> | <div style="margin: 20px;"> | ||
Line 15: | Line 21: | ||
<h1>Objective</h1> | <h1>Objective</h1> | ||
− | + | The second year of the lupus DBP is to provide a longitudinal analysis of white matter lesions such that they can characterized has they change over time (location, size, intesity).<br> | |
+ | We also will need to be able to relate these changes to any clinical or congitive symptoms, treatment regime, etc.<br> | ||
+ | Thus, for this project we will establish requirements for longitudinal analysis of lesions and an implementation plan between now and end of year 2 (july 31), including any relevant work during the 2009 summer programming week. | ||
</div> | </div> | ||
Line 29: | Line 37: | ||
<h1>Progress</h1> | <h1>Progress</h1> | ||
− | + | * Initiated discussion about the requirements, and where ChangeTracker fits. See the working document [http://wiki.na-mic.org/Wiki/index.php/ChangeTracker:Lupus_DBP here] | |
</div> | </div> |
Latest revision as of 00:22, 8 January 2009
Home < 2009 Winter Project Week:LongitudinalLesions
Key Investigators
Marcel Prastawa
Mark Scully, MIND
Jeremy Bockholt, MIND
Andrey Fedorov, William and Mary, BWH
Objective
The second year of the lupus DBP is to provide a longitudinal analysis of white matter lesions such that they can characterized has they change over time (location, size, intesity).
We also will need to be able to relate these changes to any clinical or congitive symptoms, treatment regime, etc.
Thus, for this project we will establish requirements for longitudinal analysis of lesions and an implementation plan between now and end of year 2 (july 31), including any relevant work during the 2009 summer programming week.
Approach, Plan
Review Kilians work with tumor growth see what if anything can be used Determine a plan between now and august to finish the longitudinal analysis portion of the roadmap project
Progress
- Initiated discussion about the requirements, and where ChangeTracker fits. See the working document here