Difference between revisions of "2010-09-Leadership-Brainstorming"

From NAMIC Wiki
Jump to: navigation, search
 
(23 intermediate revisions by 5 users not shown)
Line 24: Line 24:
  
 
=Computer Science=
 
=Computer Science=
*[[AlgorithmRetreat2010|Algorithm]] retreat before the end of the year
+
*[[AlgorithmRetreat2010|Algorithm]] retreat in Chapel Hill on Nov 5/6
*Engineering  
+
*[[EngineeringRetreat2010|Engineering]] retreat in Boston on Nov 17/18
 
**TCON participation is mandatory for each site. Each engineering group has to be represented at all engineering TCON's.
 
**TCON participation is mandatory for each site. Each engineering group has to be represented at all engineering TCON's.
**Wishlist for Engineering core:
 
*** Finish [http://www.slicer.org/slicerWiki/index.php/Slicer4 Slicer4] (Qt port) ASAP
 
*** Review [http://www.na-mic.org/Bug/view_all_bug_page.php Slicer3 bug tracker] for issues and feature requests - in particular widgets, command line modules, improved transforms/registration...
 
*** Interact with [http://www.kitware.com/blog/home/post/49 ITKv4], [http://commontk.org CTK], [http://nipy.sourceforge.net/software/projects/ NiPy], and other like-minded projects.
 
*** [http://www.na-mic.org/Wiki/index.php/Projects:ARRA:SlicerAM:KWWidgets VTK 3D Widgets] plans
 
*** Make plans for a new and improved [http://www.slicer.org/slicerWiki/index.php/Modules:Editor-Documentation-3.6 Editor] for slicer4
 
****Graph Cuts, RSS and fast Marching with volume cropping and volume rendering
 
****Gestures in 2d and 3d
 
***Thumbnails everywhere: mrml files, scene snapshots,
 
***Scene snapshot module: reorder, rename
 
***unified load
 
  
 
=Outreach=
 
=Outreach=
Line 45: Line 34:
  
 
=Service=
 
=Service=
*[[2010-Slicer-Factory|factory.slicer.org]] : Have the new setup ready for the AHM
+
* Centralize testing data outside of code repository (using method from ITKv4?)
 +
* "Core" Slicer distributed with InsightApplications repository with ITKv4
 +
* Switch to centralized CDash ("CDash at Home")
 +
* Support independent dashboard for each extension
 +
** Track platforms and slicer versions supported by each extension
 +
** Enable and track inter-extension dependencies
 +
* Transition to GIT
 +
** Establish a GIT workflow / policy
 +
* Support extensions hosted at other git repositories
 +
** Use ITKv4 module management technology
 +
* Transition to ITKv4
 +
* [[2010-Slicer-Factory|factory.slicer.org]] : Have the new setup ready for the AHM
 
**superbuild
 
**superbuild
 
**nightlies
 
**nightlies
Line 51: Line 51:
 
**dashboards for trunk, extensions, selected
 
**dashboards for trunk, extensions, selected
 
**updating website to reflect those changes
 
**updating website to reflect those changes
 +
*support migration of Na-mic and Slicer websites
 +
* [http://hub.opensolaris.org/bin/view/Project+opengrok/WebHome opengrok] for the na-mic kit?
  
 
=Leadership=
 
=Leadership=

Latest revision as of 17:30, 22 October 2010

Home < 2010-09-Leadership-Brainstorming
 Back to Leadership Main

Everybody

  • Please check to see that you have enough money budgeted for all necessary travel expenses: Project Weeks, All-Hands Meeting (AHM), core retreats, working meetings, participation in outreach activities.

DBP

Although the full NA-MIC team is engaged in supporting the DBPs, each DBP has been assigned specific algorithm and engineering partners from the Computer Science Cores 1A and 1B who are responsible either for providing technical support to the DBP directly, or for connecting them to the relevant NA-MIC resources. Partners have been allocated a separate line item in the budget that is distinctly allocated to support their time and travel to the DBP site.
DBP teams


Computer Science

  • Algorithm retreat in Chapel Hill on Nov 5/6
  • Engineering retreat in Boston on Nov 17/18
    • TCON participation is mandatory for each site. Each engineering group has to be represented at all engineering TCON's.

Outreach

  • Update the website after NOGA is issued
  • Plan Slicer training on the west coast
  • Consider a NAMIC training activity at University of Utah to be done in conjunction with January 2011 AHM.

Service

  • Centralize testing data outside of code repository (using method from ITKv4?)
  • "Core" Slicer distributed with InsightApplications repository with ITKv4
  • Switch to centralized CDash ("CDash at Home")
  • Support independent dashboard for each extension
    • Track platforms and slicer versions supported by each extension
    • Enable and track inter-extension dependencies
  • Transition to GIT
    • Establish a GIT workflow / policy
  • Support extensions hosted at other git repositories
    • Use ITKv4 module management technology
  • Transition to ITKv4
  • factory.slicer.org : Have the new setup ready for the AHM
    • superbuild
    • nightlies
    • extensions
    • dashboards for trunk, extensions, selected
    • updating website to reflect those changes
  • support migration of Na-mic and Slicer websites
  • opengrok for the na-mic kit?

Leadership