Engineering:TCON 08 25 2005
From NAMIC Wiki
Home < Engineering:TCON 08 25 2005
Agenda:
- Topic for Sept 8th tcon: present programming week highlights to Core3 PIs (Martha Shenton-Harvard, Andy Saykin-Dartmouth, Jim Fallon -UCI) (Tina)
- Sept 26-27-28 meeting in Boston to (a) get demos of how core 3 is using the NAMIC kit and (b) milestone planning for next 6 months. (Tina)
- Logistics for Sept mtg room at 1249 (Steve)
- Update on recent Slicer activity (Steve)
- Tracking downloads
- Setting up a test LONI pipeline with ITK module
- ITK 2.2 release
Attendees: (please add your name if it is missing) Tina Kapur, Steve Pieper, Jeffrey Grethe, Michael Pan, Jags, Will Schroeder, Andy Cedilnik, Luis Ibanez,
Highlights:
- Tracking downloads
- Steve Pieper - is there a way to collect more complete registration information from people downloading and installing software (e.g. Slicer) involved in NAMIC. For example, using a user's email to download contributed data and tools.
- This service needs to be outside of the Wiki
- Should be failry easy to setup
- Steve Pieper - is there a way to collect more complete registration information from people downloading and installing software (e.g. Slicer) involved in NAMIC. For example, using a user's email to download contributed data and tools.
- September 8th
- Core 3 PIs have agreed to attend the engineering T-CON
- Need to determine how to cover highlights of the programming week
- Sept 26-28 meeting
- Primary topic will probably be DTI module and diffusion MR
- UCI & Dartmouth working with DTI module for a current on-going study
- Update on Slicer activity
- A lot of current work on DTI and fMRI modules
- Need to think through co-development efforts in maintaining the 2.x Slicer and developments on top of this platform while moving to Slicer 3.0
- Logistics on September Meeting Room
- Room (1249 Boylston) reserved for the meeting
- Setting up a test pipeline with ITK module
- Steve Pieper suggested using the example from the Wiki
- Michael agreed that this would be a good case
- One issue raised was problems with ITK on Windows
- Issue with path delimiters in running ITK module through LONI pipeline on Windows
- Could it be a problem with the compiler (e.g.Cygwin vs. Visual Studio)
- Discussion should be continued off-line
- While Windows issues are being worked out - the UCLA group should setup the ITK Pipeline using Linux
- ITK 2.2 release is next week!